{"id":33025,"date":"2026-07-17T10:55:01","date_gmt":"2026-07-17T07:55:01","guid":{"rendered":"https:\/\/bpi-group.com.ua\/uncategorized\/tpm-and-wcm-equipment-maintenance-and-world-class-manufacturing\/"},"modified":"2026-07-17T11:02:43","modified_gmt":"2026-07-17T08:02:43","slug":"tpm-uk","status":"publish","type":"post","link":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/","title":{"rendered":"TPM and WCM: Equipment Maintenance and World-Class Manufacturing"},"content":{"rendered":"<p class=\"lead\"><strong>TPM<\/strong> (Total Productive Maintenance) is a lean manufacturing approach that ensures equipment is reliable and efficient by involving not only maintenance crews but also the operators themselves in its upkeep. The goal is to reduce wear and tear and the number of breakdowns, while increasing equipment availability and overall efficiency.<\/p>\n<p>TPM is one of the pillars of the World-Class Manufacturing (WCM) model. This page brings together everything related to this field: autonomous and scheduled maintenance, OEE, production line balancing, and practical case studies. You\u2019ll also find <a href=\"https:\/\/bpi-group.com.ua\/classes\/tpm-planove-ta-avtonomne-obslugovuvannya-obladnannya\/\">a training course on equipment maintenance<\/a> and self-study materials here.<\/p>\n<h2>What Is a TPM?<\/h2>\n<p>For manufacturing companies, the reliable operation of primary and auxiliary equipment is critical. At the same time, many plants face problems with equipment efficiency and availability due to frequent breakdowns. The main cause is usually not aging, but premature wear and tear: careless adherence to operating standards and skipping maintenance in order to meet production targets. When equipment breaks down, it results in significant losses of money, time, and profit.<\/p>\n<p>TPM establishes a system in which equipment is systematically maintained in working order, rather than simply \u201cputting out fires\u201d after every breakdown. This approach reduces wear and tear and the number of failures, and increases the efficiency of equipment use\u2014and, along with it, the stability of the entire production process. Simply put, TPM shifts maintenance from a \u201cfix it when it breaks\u201d approach to a \u201cprevent it from breaking\u201d approach.<\/p>\n<h2>Routine and Scheduled Maintenance<\/h2>\n<p>TPM is based on two complementary types of maintenance:<\/p>\n<ul>\n<li><strong>Autonomous Maintenance (AM)<\/strong> \u2014 involving operators in daily maintenance: cleaning, inspection, lubrication, and the detection and correction of minor deviations. The operator is no longer merely a \u201cuser\u201d of the equipment but becomes responsible for its condition.<\/li>\n<li><strong>Planned Maintenance (PM)<\/strong> is a system of preventive measures carried out by technical services: periodic and predictive maintenance, restoring equipment to its baseline condition, and optimizing maintenance costs.<\/li>\n<\/ul>\n<p>Together, AM and PM cover different levels of responsibility and complement each other: operators identify problems at an early stage, while technical services systematically prevent failures rather than reacting to them after the fact. Both types of maintenance are based on simple but strictly enforced standards.<\/p>\n<h2>OEE \u2014 Overall Equipment Effectiveness<\/h2>\n<p>To manage equipment performance, it must be measured. The key metric for this is <strong>OEE<\/strong> (Overall Equipment Effectiveness). It shows, as a percentage, the proportion of time that equipment operates truly effectively\u2014that is, producing only high-quality products at maximum speed and without stoppages.<\/p>\n<p>OEE is a universal metric: it allows you to compare the performance of different machines and work areas using a single set of criteria.<\/p>\n<p>OEE combines three components:<\/p>\n<ul>\n<li><strong>availability<\/strong> \u2014 the percentage of scheduled time during which the equipment was actually operating, without stoppages or downtime;<\/li>\n<li><strong>performance<\/strong> \u2014 how fast the equipment operates compared to its ideal speed;<\/li>\n<li><strong>Quality<\/strong> \u2014 the percentage of acceptable products manufactured on the first pass.<\/li>\n<\/ul>\n<p>A score of 100% across all three components would indicate a perfect process: only high-quality products, at peak speed, with no downtime. Measuring OEE is the best way to identify losses in the production flow and track the results of actions taken to eliminate them. Even a basic OEE measurement usually reveals hidden losses that no one had previously quantified.<\/p>\n<h2>Six Major Equipment Losses<\/h2>\n<p>The OEE metric is reduced by six typical categories of losses, which TPM aims to eliminate:<\/p>\n<ul>\n<li><strong>breakdowns and accidents<\/strong> \u2014 sudden stoppages caused by equipment failure;<\/li>\n<li><strong>Setup and adjustment<\/strong> \u2014 time required for changing equipment and making adjustments;<\/li>\n<li><strong>frequent stops and idling<\/strong> \u2014short but frequent periods of inactivity that are easy to overlook;<\/li>\n<li><strong>reduced speed<\/strong> \u2014 operating at a rate slower than the design capacity;<\/li>\n<li><strong>Start-up defects<\/strong> \u2014 defects that occur during the transition to normal operation after startup;<\/li>\n<li><strong>Defects and rework<\/strong> \u2014 quality losses during steady-state operation.<\/li>\n<\/ul>\n<p>The first two groups primarily affect availability, the next two affect productivity, and the last two affect quality. Therefore, addressing these losses directly improves each component of OEE. This is precisely why OEE and TPM are used together: the metric measures losses, and TPM eliminates them.<\/p>\n<h2>Why &#8220;Firefighting&#8221; Doesn&#8217;t Work: The DuPont Experience<\/h2>\n<p>A classic example is a study conducted by DuPont in the early 1990s. The company spent significantly more on maintenance than its competitors, yet its performance was worse: more overtime, more urgent spare-part purchases, and equipment availability that was 10\u201315 points lower. This paradox stemmed from a misaligned objective: when a repair team\u2019s task is limited to fixing breakdowns, and its performance is evaluated based on minimizing maintenance costs, the system does not build reliability but merely reacts to failures.<\/p>\n<p>This is where TPM changes the approach: the focus shifts from \u201crepairs\u201d to preventing breakdowns, and the goal becomes equipment reliability and availability rather than the cheapest possible repair. A detailed analysis of these findings is presented in an article on <a href=\"https:\/\/bpi-group.com.ua\/blog\/pidvishhennya-nadijnosti-ta-efektivnosti-roboti-obladnannya-dosvid-dupont\/\">improving equipment reliability using DuPont as an example<\/a>.<\/p>\n<h2>WCM and Production Line Balancing<\/h2>\n<p>TPM is part of the broader World-Class Manufacturing (WCM) framework. In addition to equipment reliability, it also covers the design of the production lines themselves. One of the key tools here is <strong>production line balancing<\/strong>: distributing operations among workstations so that their workload is even, and the line operates in sync with demand (the takt time), without \u201cbottlenecks\u201d or downtime. The goal of balancing is to align the line\u2019s rhythm with the takt time\u2014that is, with the pace at which the customer orders products.<\/p>\n<p>An unbalanced line almost always has sections with overloads and sections with idle time, so balancing directly affects productivity and production costs. The logic behind this tool is explained using a simple conveyor belt example in the materials on <a href=\"https:\/\/bpi-group.com.ua\/blog\/balansuvannya-virobnicho%d1%97-lini%d1%97\/\">production line balancing<\/a>.<\/p>\n<h2>What Are the Benefits of Implementing TPM and WCM?<\/h2>\n<p>The systematic implementation of TPM and WCM enables:<\/p>\n<ul>\n<li>reduce the number of equipment breakdowns and unplanned downtime;<\/li>\n<li>improve equipment availability and the OEE metric;<\/li>\n<li>reduce maintenance costs by preventing failures rather than dealing with the consequences;<\/li>\n<li>engage operators and foster a culture of careful handling of equipment;<\/li>\n<li>ensure the stability of the production flow, on which all other improvements depend.<\/li>\n<\/ul>\n<p>These effects build on one another: reliable equipment provides a predictable flow, which in turn serves as the foundation for pull production, inventory reduction, and further improvements.<\/p>\n<h2>Common Mistakes When Implementing TPM<\/h2>\n<p>The most common mistake is to limit TPM efforts solely to the maintenance department, without involving operators: without autonomous maintenance, the system will not truly function. Another pitfall is measuring maintenance effectiveness by repair costs rather than by equipment reliability and availability, as DuPont\u2019s experience shows. Often, TPM is attempted to be implemented \u201cfrom the top down,\u201d without training the teams and without organizing the work area\u2014in which case the program quickly fizzles out. Finally, implementation without measuring OEE deprives the team of an objective picture of losses and criteria for progress. Therefore, TPM begins with an assessment of the equipment\u2019s baseline condition, the involvement of operators, and clear measurement of results.<\/p>\n<h2>TPM in the Lean Manufacturing System<\/h2>\n<p>TPM does not exist in isolation from other Lean tools. Autonomous maintenance relies on the order and cleanliness provided by <a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/5s-uk\/\">the 5S system<\/a>: clean equipment is much easier to inspect and monitor. Unreliable equipment disrupts the flow, so TPM is closely linked to <a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/vsm-uk\/\">value stream mapping<\/a> and pull systems. And to prevent breakdowns from recurring, <a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/rca-uk\/\">root cause analysis<\/a> is used. An article on <a href=\"https:\/\/bpi-group.com.ua\/blog\/metodologi%d1%97-operaczijno%d1%97-doskonalosti-taksonomiya-osnovnih-pidhodiv\/\">the taxonomy of operational excellence methodologies<\/a> provides an overview of how all these approaches fit together.<\/p>\n<h2>Related Materials<\/h2>\n<div class=\"res\">\n<h3>Fundamentals of TPM \/ WCM<\/h3>\n<ul>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/metodologi%d1%97-operaczijno%d1%97-doskonalosti-taksonomiya-osnovnih-pidhodiv\/\">Methodologies for Operational Excellence: A Taxonomy of Key Approaches <\/a> \u2014 The role of TPM and WCM among Lean tools. <span class=\"tag\">Article<\/span><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/classes\/tpm-ta-virobnicha-sistema-wcm\/\">WCM (TPM). Implementing the system within the company <\/a> \u2014 a training session on building a world-class production system. <span class=\"tag\">Training<\/span><\/li>\n<\/ul>\n<h3>Equipment Maintenance and Performance<\/h3>\n<ul>\n<li><a href=\"https:\/\/bpi-group.com.ua\/classes\/tpm-planove-ta-avtonomne-obslugovuvannya-obladnannya\/\">TPM: Scheduled and Autonomous Equipment Maintenance <\/a> \u2014 A two-day hands-on training course on AM, PM, and OEE. <span class=\"tag\">Training<\/span><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/pidvishhennya-nadijnosti-ta-efektivnosti-roboti-obladnannya-dosvid-dupont\/\">Improving Equipment Reliability and Efficiency: DuPont&#8217;s Experience <\/a> \u2014 Why higher costs don&#8217;t necessarily mean better service. <span class=\"tag\">Article<\/span><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/rozrahunok-zagalno%d1%97-efektivnosti-obladnannya-oee\/\">Calculating Overall Equipment Effectiveness (OEE)<\/a> \u2014How to Measure OEE and Its Components. <span class=\"tag\">Article<\/span><\/li>\n<\/ul>\n<h3>Line Design and Balancing<\/h3>\n<ul>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/balansuvannya-virobnicho%d1%97-lini%d1%97\/\">Production Line Balancing<\/a> \u2014 How to Distribute Operations Evenly Among Workstations. <span class=\"tag\">Article<\/span><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/prostij-priklad-balansuvannya-virobnicho%d1%97-lini%d1%97\/\">A Simple Example of Production Line Balancing<\/a> \u2014 The Logic of Balancing Using a Conveyor as an Example. <span class=\"tag\">Article<\/span><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/events\/2022-05-proektuvannya-i-balansuvannya-virobnichih-linij\/\">Design and Balancing of Production Lines<\/a> \u2014 Seminar in the Form of an Event. <span class=\"tag\">Event<\/span><\/li>\n<\/ul>\n<h3>Events<\/h3>\n<ul>\n<li><a href=\"https:\/\/bpi-group.com.ua\/events\/2022-03-tpm-wcm-introduction\/\">WCM (TPM). Implementing the system within the company <\/a> \u2014 an introductory workshop on the approach. <span class=\"tag\">Event<\/span><\/li>\n<\/ul>\n<\/div>\n<h2>Related Tools and Approaches<\/h2>\n<p>TPM works best when combined with other lean manufacturing tools:<\/p>\n<ul>\n<li><a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/5s-uk\/\">The 5S System<\/a> \u2014 Order and Cleanliness as the Foundation of Self-Managed Operations.<\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/vsm-uk\/\">Value Stream Mapping (VSM)<\/a> \u2014 Equipment reliability as a prerequisite for a stable flow.<\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/kanban-uk\/\">Kanban<\/a> is a pull-based production system that relies on predictable line output.<\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/knowledge-areas\/rca-uk\/\">Root Cause Analysis (RCA)<\/a> \u2014 eliminating the root causes of recurring failures.<\/li>\n<\/ul>\n<h2>Popular queries<\/h2>\n<ul class=\"chips\">\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/metodologi%d1%97-operaczijno%d1%97-doskonalosti-taksonomiya-osnovnih-pidhodiv\/\">TPM<\/a><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/classes\/tpm-planove-ta-avtonomne-obslugovuvannya-obladnannya\/\">self-service<\/a><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/rozrahunok-zagalno%d1%97-efektivnosti-obladnannya-oee\/\">OEE Calculation<\/a><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/pidvishhennya-nadijnosti-ta-efektivnosti-roboti-obladnannya-dosvid-dupont\/\">equipment reliability<\/a><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/blog\/balansuvannya-virobnicho%d1%97-lini%d1%97\/\">production line balancing<\/a><\/li>\n<li><a href=\"https:\/\/bpi-group.com.ua\/classes\/tpm-ta-virobnicha-sistema-wcm\/\">WCM production system<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>TPM (Total Productive Maintenance) is a lean manufacturing approach that ensures equipment is reliable and efficient by involving not only maintenance crews but also the operators themselves in its upkeep. The goal is to reduce wear and tear and the number of breakdowns, while increasing equipment availability and overall efficiency. TPM is one of the [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":32904,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[111,111],"tags":[],"knowledge-areas":[],"class_list":["post-33025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.6 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>TPM and WCM: Equipment Maintenance and OEE | BPI Group<\/title>\n<meta name=\"description\" content=\"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/posts\/33025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TPM and WCM: Equipment Maintenance and World-Class Manufacturing\" \/>\n<meta property=\"og:description\" content=\"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/\" \/>\n<meta property=\"og:site_name\" content=\"BPI Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/business.process.improvement\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-17T07:55:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-17T08:02:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"495\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Khrystyna Baranova\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"TPM and WCM: Equipment Maintenance and OEE | BPI Group\" \/>\n<meta name=\"twitter:description\" content=\"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/\"},\"author\":{\"name\":\"Khrystyna Baranova\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#\\\/schema\\\/person\\\/e99fb0730723b1c9516dbe6b2f99a858\"},\"headline\":\"TPM and WCM: Equipment Maintenance and World-Class Manufacturing\",\"datePublished\":\"2026-07-17T07:55:01+00:00\",\"dateModified\":\"2026-07-17T08:02:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/\"},\"wordCount\":1485,\"publisher\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bpi-group.com.ua\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/rectangle-9-1.png\",\"articleSection\":[\"\u0431\u043b\u043e\u0433\",\"\u0431\u043b\u043e\u0433\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/\",\"url\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/\",\"name\":\"TPM and WCM: Equipment Maintenance and OEE | BPI Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bpi-group.com.ua\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/rectangle-9-1.png\",\"datePublished\":\"2026-07-17T07:55:01+00:00\",\"dateModified\":\"2026-07-17T08:02:43+00:00\",\"description\":\"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bpi-group.com.ua\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/rectangle-9-1.png\",\"contentUrl\":\"https:\\\/\\\/bpi-group.com.ua\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/rectangle-9-1.png\",\"width\":1440,\"height\":495},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/blog\\\/tpm-uk\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f\",\"item\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TPM and WCM: Equipment Maintenance and World-Class Manufacturing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/\",\"name\":\"BPI Group\",\"description\":\"\u041e\u0431\u0443\u0447\u0435\u043d\u0438\u0435 \u0438 \u043a\u043e\u043d\u0441\u0430\u043b\u0442\u0438\u043d\u0433 \u0432 \u043e\u043f\u0435\u0440\u0430\u0446\u0438\u043e\u043d\u043d\u043e\u043c \u043c\u0435\u043d\u0435\u0434\u0436\u043c\u0435\u043d\u0442\u0435\",\"publisher\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#organization\",\"name\":\"BPI Group\",\"url\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bpi-group.com.ua\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/bpi-logo-0E3266.svg\",\"contentUrl\":\"https:\\\/\\\/bpi-group.com.ua\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/bpi-logo-0E3266.svg\",\"width\":1,\"height\":1,\"caption\":\"BPI Group\"},\"image\":{\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/business.process.improvement\",\"https:\\\/\\\/www.linkedin.com\\\/groups\\\/4698362\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCcX84yBai_5Is-HtV_VKdlA\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/bpi-group.com.ua\\\/en\\\/#\\\/schema\\\/person\\\/e99fb0730723b1c9516dbe6b2f99a858\",\"name\":\"Khrystyna Baranova\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/276fa0dbd49a21c63f3e6d9fae97b2ce86692872d3fdc07080528e0e1ecaf550?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/276fa0dbd49a21c63f3e6d9fae97b2ce86692872d3fdc07080528e0e1ecaf550?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/276fa0dbd49a21c63f3e6d9fae97b2ce86692872d3fdc07080528e0e1ecaf550?s=96&d=mm&r=g\",\"caption\":\"Khrystyna Baranova\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"TPM and WCM: Equipment Maintenance and OEE | BPI Group","description":"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/posts\/33025\/","og_locale":"en_US","og_type":"article","og_title":"TPM and WCM: Equipment Maintenance and World-Class Manufacturing","og_description":"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.","og_url":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/","og_site_name":"BPI Group","article_publisher":"https:\/\/www.facebook.com\/business.process.improvement","article_published_time":"2026-07-17T07:55:01+00:00","article_modified_time":"2026-07-17T08:02:43+00:00","og_image":[{"width":1440,"height":495,"url":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png","type":"image\/png"}],"author":"Khrystyna Baranova","twitter_card":"summary_large_image","twitter_title":"TPM and WCM: Equipment Maintenance and OEE | BPI Group","twitter_description":"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.","twitter_image":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#article","isPartOf":{"@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/"},"author":{"name":"Khrystyna Baranova","@id":"https:\/\/bpi-group.com.ua\/en\/#\/schema\/person\/e99fb0730723b1c9516dbe6b2f99a858"},"headline":"TPM and WCM: Equipment Maintenance and World-Class Manufacturing","datePublished":"2026-07-17T07:55:01+00:00","dateModified":"2026-07-17T08:02:43+00:00","mainEntityOfPage":{"@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/"},"wordCount":1485,"publisher":{"@id":"https:\/\/bpi-group.com.ua\/en\/#organization"},"image":{"@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#primaryimage"},"thumbnailUrl":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png","articleSection":["\u0431\u043b\u043e\u0433","\u0431\u043b\u043e\u0433"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/","url":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/","name":"TPM and WCM: Equipment Maintenance and OEE | BPI Group","isPartOf":{"@id":"https:\/\/bpi-group.com.ua\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#primaryimage"},"image":{"@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#primaryimage"},"thumbnailUrl":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png","datePublished":"2026-07-17T07:55:01+00:00","dateModified":"2026-07-17T08:02:43+00:00","description":"TPM (Total Productive Maintenance) \u2014 equipment maintenance for reliability and efficiency: autonomous and scheduled maintenance, OEE, WCM. Resources and training from BPI Group.","breadcrumb":{"@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#primaryimage","url":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png","contentUrl":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2026\/07\/rectangle-9-1.png","width":1440,"height":495},{"@type":"BreadcrumbList","@id":"https:\/\/bpi-group.com.ua\/en\/blog\/tpm-uk\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f","item":"https:\/\/bpi-group.com.ua\/en\/"},{"@type":"ListItem","position":2,"name":"TPM and WCM: Equipment Maintenance and World-Class Manufacturing"}]},{"@type":"WebSite","@id":"https:\/\/bpi-group.com.ua\/en\/#website","url":"https:\/\/bpi-group.com.ua\/en\/","name":"BPI Group","description":"\u041e\u0431\u0443\u0447\u0435\u043d\u0438\u0435 \u0438 \u043a\u043e\u043d\u0441\u0430\u043b\u0442\u0438\u043d\u0433 \u0432 \u043e\u043f\u0435\u0440\u0430\u0446\u0438\u043e\u043d\u043d\u043e\u043c \u043c\u0435\u043d\u0435\u0434\u0436\u043c\u0435\u043d\u0442\u0435","publisher":{"@id":"https:\/\/bpi-group.com.ua\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bpi-group.com.ua\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bpi-group.com.ua\/en\/#organization","name":"BPI Group","url":"https:\/\/bpi-group.com.ua\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bpi-group.com.ua\/en\/#\/schema\/logo\/image\/","url":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2021\/04\/bpi-logo-0E3266.svg","contentUrl":"https:\/\/bpi-group.com.ua\/wp-content\/uploads\/2021\/04\/bpi-logo-0E3266.svg","width":1,"height":1,"caption":"BPI Group"},"image":{"@id":"https:\/\/bpi-group.com.ua\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/business.process.improvement","https:\/\/www.linkedin.com\/groups\/4698362\/","https:\/\/www.youtube.com\/channel\/UCcX84yBai_5Is-HtV_VKdlA"]},{"@type":"Person","@id":"https:\/\/bpi-group.com.ua\/en\/#\/schema\/person\/e99fb0730723b1c9516dbe6b2f99a858","name":"Khrystyna Baranova","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/276fa0dbd49a21c63f3e6d9fae97b2ce86692872d3fdc07080528e0e1ecaf550?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/276fa0dbd49a21c63f3e6d9fae97b2ce86692872d3fdc07080528e0e1ecaf550?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/276fa0dbd49a21c63f3e6d9fae97b2ce86692872d3fdc07080528e0e1ecaf550?s=96&d=mm&r=g","caption":"Khrystyna Baranova"}}]}},"_links":{"self":[{"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/posts\/33025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/comments?post=33025"}],"version-history":[{"count":0,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/posts\/33025\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/media\/32904"}],"wp:attachment":[{"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/media?parent=33025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/categories?post=33025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/tags?post=33025"},{"taxonomy":"knowledge-areas","embeddable":true,"href":"https:\/\/bpi-group.com.ua\/en\/wp-json\/wp\/v2\/knowledge-areas?post=33025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}